Plastic cover auto lamp injection molding in automotive industry high quality tooling
Mould Information:
Name | Plastic Injecition Mold |
Mould core | P20,NAK80,SKD11,S316,S50C,S45C,718H,718 or customers' appointed |
Mould base | LKM, HASCO, DME or upon customer's requirement |
Type of plastic mold | 3-plate mold,2-plate mold |
Cavity | Single/Multi 1*1,1+1,1*2,1+1+1,etc |
Mode Gate | Fan gate, Sub gate, PinPoint gate, Valve |
Ejection system | Stripper plate, Lifter, Push Bar, Ejection Pin, etc |
Runner | Hot/cold type |
Plastic material | HDPE, PP, nylon, PEEK, LDPE, ABS, styrene, acrylic, acetal, PE, PTFE, PEI, and PES |
Mould life | 300,000-1,000,000 shots |
Lead time | 15-35days after deposit received |
Specification | Follow the 3D final drawing |
Packaging details | covering with film for anti-rust and packed with wooden Case |
Production Discription
Product Material | ABS,AS,PP,PPS,PC,PE,POM,PMMA,PS,HDPE,TPE,TPU etc |
Surface finish | Polishing finish,Texture Finish,Glossy Finish,Painting,Slik print,Rubber Painting etc |
Packaging details | Carton box or wooden Case upon product weight and customer's requirements. |
Shipping | By sea or by air as customer requirement |
Export Country | Japan,Europe,USA,Mexico,Australia,Middle East,Korea,Asia etc |
Typical Used For |
Housings, containers, caps, fittings, including as below |
Range of markets |
industrial, consumer, food processing, aviation, seals/gaskets, lighting, packaging, filter, healthcare, telecommunications, mechanical, water treatment, appliance, recreation, lawn and garden, educational, oil and gas, government, construction, plumbing, surveillance, pumps, marine, motors, gears, RFID tags, electronics, and fasteners. |
Tooling Developing Procedure:
1. Quotation: We need your require clearly
2. Negotiation: Material, cavity, price, delivery time, payment term, etc.
3. Order: According to your own design or choice our design
4. DFMEA: Deign failure mold & Effect analysis to reduce risk
5. Mold design: 2D/3D drawing
6. Cutting Tooling Notice: After customer approve the mould design will start making mould
7. Weekly Report: We will update the mold schedule every week
8. Sample Confirm: Send you samples to confirm it, if not satisfied by customers. We modify the mould.
9. Delivery Mold: Delivery the mould after customer approve sample and arrange shipment
Quality assurance and service: