Send Message
Dongguan Howe Precision Mold Co., Ltd. 86-769-85339899 betty@howemold.com
POM HDPE Plastic Injection Molding For Automotive Industry

POM HDPE Plastic Injection Molding For Automotive Industry

  • High Light

    HDPE Plastic Injection Molding

    ,

    POM Plastic Injection Molding

    ,

    MISUMI Automotive Plastic Injection Molding

  • Automotive Plastic Injection Molding
    Auto Spare Parts Plastic Injection Tooling
  • Ejection System
    Stripper Plate,Lifter,Push Bar,Ejection Pin Etc
  • Hardness Of Steel
    18~56 HRC
  • Cavity Material
    S136HRC48-52
  • Injection Machine
    90T-1000T
  • Surface Treatment
    Heat Treatment, Polishing
  • Gate Type
    Pin Point Gate
  • Cycle Time
    10-12S
  • Design File
    STP, IGS, DXF, DWG, Cad Key PPT, STL, X_T, CATIA, UG Files, Etc.
  • Design Software
    CAD, UG, ProE
  • Place of Origin
    China
  • Brand Name
    OEM/ODM
  • Certification
    ISO9001
  • Model Number
    HW-332
  • Minimum Order Quantity
    1 set
  • Price
    negotiable
  • Packaging Details
    wooden box , as customer requested
  • Delivery Time
    25-45days
  • Payment Terms
    T/T, Western Union
  • Supply Ability
    300-400 sets/year

POM HDPE Plastic Injection Molding For Automotive Industry

Plastic injection molding in automotive industry high volume plastic auto parts supplier

 

Mould Information:

 

Mold Material 45#,P20 steel, 718, 2738, H13, NAK80, 2344, 2343, S136, etc .
Mold Type Plastic Injection Molding
Product Material ABS,PA,PA66+GF,POM,PC,PP,PET,TPE,PVC,HDPE,etc
Mold Standard HASCO, DME, MISUMI, JIS, LKM, etc.
Mold Tooling Equipment Lathe, Milling, Grinder, Drill, CNC, EDM, Wire cut machine, Punch machine
Injection Mold Machine 22 Sets With Model 90T to 1100T
Gate Type Side Gate, Sub Gate, Direct Gate, Hook Gate, Pin Point Gate, etc.
Runner Type Cold Runner or Hot Runner
Cavity Single or Multi cavities
Mold Life 45#:50,000 to 100,000 shots
P20:100,000 to 200,000 shots
718: 200,000 to 300,000 shots
H13: 300,000 to 500,000 shots
Lead Time Generally, mold making will take around 30 days and 7-10 day to mass production
Package Wooden packing box for molds and Generally inner packed in opp bags, outside packed in standard export carton with shipping marks, and the cartons will be full of bubble bags.

 

 

 

POM HDPE Plastic Injection Molding For Automotive Industry 0

 

POM HDPE Plastic Injection Molding For Automotive Industry 1

 

 

 

Our Services
 
Item Name Expert of Precision Injection Plastic Tooling Design and Mold Maker
Service 1.CNC Plastic/Metal Prototypes
2.Silicon Mould
3.Low Volume Production
4.Rapid Hardware/Sheet Metal Prototypes
5.CNC Aluminum/Brass/Copper/Bronze CNC machining/machined parts
6.Automotive and medical equipment Prototypes
7.SLA/SLS prototype
8.Metal Stamping&NCT Stamping
9.3D Printing
10.Die-casting, hardware machining
11.Electronic Manufacturing Service
12.Injection mould&Plastic Injection
13. Lathing parts
14.Design service (OEM service)
Certification passed Bureau Veritas, ROHS, ISO

 

 

FAQ:

 

1. What is your business?
A. Precision Plastic Mold manufacture
B. Medium and large plastic mold manufacture
C. Injection molding
D. professional designing and making
E. R&D service


2. How about tolerance?
Mold tolerance is 0.005 mm, Product tolerance is 0.02 mm.


3. What steel do you usually use?
We usually use steel of P20, P20H, H-13,O-1,S-7,420,420H,D2, NAK80, 1.2311, 1.2711,1.2344,1.2510,1.2083,1.2316 and 1.2379.


4. What standard components do you usually use?
We use standard components from LKM, DAIDO, HASCO, DME. (Hot Runner: MOLD MASTER, HUSKY, DME, HASCO, INCOE, THERMOPLAY, YUDO.)


5. What do you need for a quotation?
We need 2D part drawing & 3D drawing, and specific mold or part requirements.
2D File Format dwg /dxf /pdf/jpg ,3D Model Format step /x_t /igs /prt


6.How about your mold payment terms?
Mold payment terms:40%-30%-30%.The first payment is when you sign the order, you should pay us 40% of the total value; the second payment is when you receive our sample product, you should pay us 30% of the total value; the last payment is when we deliver the mold for you, you should pay off the balance payment,30% of the total value.


7. How about your part payment terms?
Part payment terms:50%-50%.The first payment is when you sign the order, you should pay us 50% of the total value to purchase the material; The last payment is when we deliver the part for you, you should pay off the balance payment,50% of the total value.


8. What’s your after-sales?
After-sales: Our customer’s mold drawings and the whole data will be kept in a database for 5 years at least.so that when you need our technical support or service, we can be easy and possible to serve you and your customers.