plastic injection molding / Mould making plastic Auto Equipment Parts Products
Company | Dongguan Howe Precision Mold Co., Ltd |
Business Type | Manufacture |
Place of Origin | Dongguan, China |
Export Country | America,Europe,Japan, Australian ,UK,Canada,Israel,Indonesia,Mid East etc.... |
Quality System | ISO9001 |
Mould life | 300,000-1,000,000shots |
Mould base Material | Standard LKM, HASCO, customized |
Core&Cavity Material | Nak80,P20,H718,S136,SKD61,2738,DC53,H13.... |
Products Material | ABS,PP,PVC,PET,PA66,PA6 etc. |
Design Software | UG, Pro E Solidwork, AutoCAD, Moldflow ... |
Runner | Hot runner, cold runner |
Gate | Side gate, Sub gate, Pinpoint Gate... |
Delivery Time | 25-30days for mold, plastic products according to quantity |
Package | Wooden box for mold, carton for plastic products |
plastic Injection Machine | 12 sets,80t-350t |
MOQ | 1set for mold, plastic products as per your request |
Experience | 20 years experience in plastic injection mold making and plastic products produced |
Plastic Mold production process | Description |
1. 3d Design/Samples for quotation | According to 3D drawing or samples for quotation. |
2.Negotiations | Including the price of molds, molds sizes, material for cores & cavities, weight of product, part cost, payment, molds lifetime, delivery, etc. |
3. Purchasing Order | After the customer confirming the mold design and quotation. |
4. Making mold(mould) | Confirm drawing, start to do DFM, mold flows and mold detail agreed with the customer, start production. |
5. Production schedule | Every week we will feedback to the customer mold progress(picture). |
6. sample shoot | We provide the molds test samples for confirmation(about 10-15 pieces), then, get your signature sample, mass production. |
7. Package | Wooden case for molds, cartons for parts, or as your requirement. |
8. Delivery | Deliver goods by air or by sea. |
1. How about your quality control?
We have a professional team to control mould quality, since we realize that quality control is the first priority to run business.
2. What‘s your lead time?
For most mould, 15-45 working days ( not including Chinese official holidays ) after deposit received and mould drawings approved.
3. What type of process do you use on mould surface?
1) Mirror polish
2)Texture
3) Plating treatment on the core and cavity.
4) According to the customers’ products need.
4. How to approval samples?
1) You can come to have the mould test directly.
2) We could send samples & mould running video to you.
5. What about after-service?
Spare parts delivery is available, and you can contact us at any time.