ABS plastic injection molds for thin wall crate plastic injection molding factories
The main Mold Steel and Hardness for your reference:
Steel Grade | S50C | P20 | P20HH | 718H | H13 | 2738 | 2311 | NAK80 |
Hardness | 17-22 | 27-30 | 33-37 | 33-38 | 45-50 | 36-40 | 28-32 | 34-40 |
Tips: Mold maintenance:
1) Once the mold is vacant, spray the anti-rust oil
2) To clean the gate and cooling system regularly
3) Operation the injection machine properly.
Mold Type | Plastic injection mold |
Mold Cavity&Core Steel | P20, 718H , H13, 2344 , 2316 , NAK80 |
Mold Base | LKM, DME, HASCO or by request |
Mold Cavity | Single /Family /Multi by requested |
Mold Process | CNC, High-Speed Engrave, EDM, Wire-Cutting, Drill, etc. |
Injection type | Pin-point, Sub-gate, edge gate, sprue gate, direct gate |
Mold Runner System | Cold runner or Hot runner(YUDO, HASCO .CHINESE ETC) |
Mold finish | Mirror finish, Texture finish, Corrosion word |
Mold Life | 0.5-1 million shots |
Delivery Time | 25-50 days |
Specification | Depends on customer’s requirements |
Aluminum parts | Stainless Steel parts | Steel | Plastic |
Clear Anodized | Polishing | Zinc plating | Painting |
Color Anodized | Passivating | Oxide black | Chrome plating |
Sandblast Anodized | Sandblasting | Nickel plating | polishing |
Chemical Film | Laser engraving | Chrome plating | Sandblast |
Brushing | Carburized | Laser engraving | |
Polishing | Heat treatment | ||
Chroming |
1. What is your business?
1) Precision Plastic Mold manufacture
2) Medium and large plastic mold manufacture
3) Injection molding
4) professional designing and making
5) R&D service
2. How about tolerance?
Mold tolerance is 0.005 mm, Product tolerance is 0.02 mm.
3. What steel do you usually use?
We usually use steel of P20, P20H, H-13,O-1,S-7,420,420H,D2, NAK80, 1.2311, 1.2711,1.2344,1.2510,1.2083,1.2316 and 1.2379.
4. What standard components do you usually use?
We use standard components from LKM, DAIDO, HASCO, DME. (Hot Runner: MOLD MASTER, HUSKY, DME, HASCO, INCOE, THERMOPLAY, YUDO.)
5. How about your quality control?
We have a professional team to control mould quality, since we realize that quality control is the first priority to run business.
6. hat do you need for a quotation?
We need 2D part drawing & 3D drawing, and specific mold or part requirements.
2D File Format dwg /dxf /pdf /jpg ,3D Model Format step /x_t /igs /prt
7. How about your mold payment terms?
Mold payment terms:40%-30%-30%.The first payment is when you sign the order, you should pay us 40% of the total value; the second payment is when you receive our
sample product, you should pay us 30% of the total value; the last payment is when we deliver the mold for you, you should pay off the balance payment,30% of the total
value.
8. How about your part payment terms?
Part payment terms:50%-50%.The first payment is when you sign the order, you should pay us 50% of the total value to purchase the material; The last payment is when
we deliver the part for you, you should pay off the balance payment,50% of the total value.
9. What‘s your lead time?
For most mould, 15-45 working days ( not including Chinese official holidays ) after deposit received and mould drawings approved.
10.What type of process do you use on mould surface?
1) Mirror polish
2)Texture
3) Plating treatment on the core and cavity.
4) According to the customers’ products need.
11. How to approval samples?
1) You can come to have the mould test directly.
2) We could send samples & mould running video to you.
12.What’s your after-sales?
After-sales: Our customer’s mold drawings and the whole data will be kept in a database for 5 years at least.So that when you need our technical support or service, we
can be easy and possible to serve you and your customers.